So after finally BT sent my special offer email with the full-fibre price (after the fleet of Open Reach vans finally left the estate) that was just too good to ignore … much as I tried for at least 4 hours. Two weeks on and there is an engineer downstairs putting together a fibre termination unit.
So before I lose my old connection, the speed test settings look like this;
Which is pretty much bang on for the product I currently have which I think is billed at £31.99 / month. The new product is an additional £14 a month which I’m hoping to make back in reduced hosting fees …
Getting the fibre from the hole in the pavement, through the ducts, around the house and into the house have taken around 1h20m, which seems pretty good so far for a lone engineer.
… to be continued.